The Works are the design and construction of the new Springs leisure centre. Works include a new five court sports hall, 25m swimming pool and 13m learner pool, health suite, wet changing village, dry changing areas, viewing area for the pool, soft play, co-location offices/wellbeing hub, multi-use fitness studio, 3nr studios, competition standard indoor bowls, pool plant. The existing building is to be demolished and replaced with permeable paving.
Date limite
24.09.2026
Publié
06.10.2026
Attribué
06.10.2026
Hom Low Rise Bin Store Ceiling Repairs
Attribué·Oct 28
Fire Safety Reactive Repairs
Attribué·Oct 26
Springs Leisure Centre PCSA - Leisure Investment Programme
Attribué·Aug 19
Concord Leisure Centre Pcsa - Leisure Facilities Programme
Attribué·Aug 19
Housing Legionella Remedial Works - Term Contract 2026-2029
Attribué·Aug 19
Forge Dam Leaking Sluice Gate (Construction Works)
Attribué·Aug 17
Springs Leisure Centre PCSA - Leisure Investment Programme
Attribué·Aug 19
Concord Leisure Centre Pcsa - Leisure Facilities Programme
Attribué·Aug 19
Dbom Tender for a New Basingstoke Leisure Centre
Attribué·Jul 7
Leys Park Changing Pavilion Dagenham, Refurbishment
Clôturé·Jun 20
ESPH599 SB WDC Knights Farm Sports Hub Construction
Attribué·Oct 2
Accountancy Apprenticeships
Attribué·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Attribué·Oct 29
Transition and Exit Technical Support Service
Attribué·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Attribué·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Ouvert aux offres·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Attribué·Oct 29
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.