The school has experienced persistent wastewater blockages affecting several toilet blocks. These issues require a sitewide CCTV investigation of the existing sewer pipework to identify the underlying cause and inform any required remediation works. The intended outcome is to confirm the condition, location and performance of the school’s wastewater network, identify defects and blockages, complete approved urgent minor repairs where required, and provide the information needed to plan any longer-term remediation or maintenance works. As the works may be disruptive and involve access to toilet blocks and underground services, the investigation and any urgent minor repairs should be planned to minimise disruption to school operations and should be scheduled during school holiday periods.
Publié
14.09.2026
Ouvert aux offres
14.09.2026
Date limite
12.10.2026
RFT - Main Building Contractor for Blocks 1, 2, 3, 4 - Roofing Repairs at Tui Glen School, Stokes Valley, Lower Hutt
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
Registration of Interest - Kerikeri High School - Main Contractor - Roofing Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
Main Contractor for the Blocks 4 and 6 DQLS and ILE Upgrade at Wapipi School
ROI - Otara Wastewater Network Upgrade Design Services
Suppliers of Independent Asset Management Reviews
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
High Tech Imaging Services
Elective Surgery Services
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
© 2026 SIA «Vietne». Tous droits réservés.