Otnox
IEIrlande·Acheteur: Beaumont Hospital

Single Party Framework Agreement for the Provision of Energy Efficient Design Services

Clôturé·28 sept. 2026·EUR 500,000

The Energy Efficient Design (EED) process is intended to ensure that the Contracting Authority’s capital projects are conducted in accordance with objective and methodical protocols and procedures. The overall EED process comprises organisational measures, processes, guiding principles and control mechanisms to be implemented during the design of projects, with the targets of (i) reducing the lifecycle energy consumption and GHG emissions of the building when in use and (ii) achieving a building that is Carbon Zero Ready (i.e., a building that will be carbon zero when the electrical grid decarbonises). In accordance with national and sectoral guidance, the EED process shall be applied to all projects with a value greater than €1,000,000. The purpose of this competition is to appoint a suitably-qualified and experienced EED Facilitator who will draft and submit key EED reports in accordance with this Specification of Requirements document. Such reports will serve to measure progress of the EED process as applied to each capital project and effectively communicate the results of the EED process to Contracting Authority project stakeholders.

Publié

28.09.2026

Ouvert aux offres

28.09.2026

Date limite

02.11.2026

Otnox

Trouvez les appels d’offres auxquels il vaut la peine de répondre.

Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.

  • Documents de l’appel d’offresConsultez les fichiers disponibles dans un seul espace de travail.
  • Exigences et risquesDemandez une analyse des documents avec des références aux sources.
  • Votre sélection d’appels d’offresPoursuivez avec les marchés et secteurs choisis.