The redevelopment of Scott Base is Antarctica New Zealand’s largest and most complex project ever undertaken. The aim of the project is to ensure Aotearoa New Zealand has safe, fit-for-purpose, and sustainable infrastructure that safeguards its continuous presence in Antarctica, enables its world-leading scientific research programme, and strengthens engagement with the Antarctic Treaty System. Antarctica New Zealand is seeking proposals from suitably qualified Electrical Engineering Consultants to provide Technical Support for the Ross Island Wind Energy (RIWE 2.0) programme. This role will serve as the primary electrical advisor to Antarctica New Zealand, ensuring that all electrical and control systems of the RIWE system are designed, reviewed, and commissioned in alignment with operational requirements, environmental constraints, and long-term maintainability.
Date limite
10.09.2025
Publié
23.01.2026
Attribué
23.01.2026
Nelson City Council - ROI - NTRLBU - Waste to Watts Project - 24 Nov 2026
Ouvert aux offres·Nov 2
Part A - Request for Comment (RFC) - Tauranga Urban, Tauranga School and Rotorua Urban Bus Services
Ouvert aux offres·Nov 2
14441 - Personalised Plates - ROI
Ouvert aux offres·Nov 2
Corporate Experience Programme
Ouvert aux offres·Nov 2
Registration of Interest (ROI) - Devonport Small Boats Facility
Ouvert aux offres·Nov 2
Te Kuiti Stormwater Rehabilitation - stormwater pipe lining
Ouvert aux offres·Nov 2
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.