The planned construction of a third platform at Salford Crescent station aims to improve passenger flow and reduce train delays by allowing more flexibility for trains traveling through central Manchester and across the country. The construction project includes the addition of a new lift shaft and stairs from the existing ticket office. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Salford Crescent Station, it aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. Kier are seeking expressions of interest for Terracotta cladding on the lift shaft at Salford Crescent.
Date limite
24.02.2025
Publié
06.01.2026
Awarded
06.01.2026
Procurement of Phase 1 Cladding and Remedial Works - Chloe Court and Thalia Court
CA17414 - Salford College-Design and construction of a cladding refurbishment
Supply Chain Notice: WP041 External Envelope (excl. brickwork)
Supply Chain Notice: WP041 External Envelope (excl. brickwork)
MWF Lot 3 - Butts Primary School - Thermal Upgrade - AWARD
MWF Lot 3 DA - Horndean Technology College - SCOLA Reclad - S Block - AWARD
© 2026 SIA «Vietne». Tous droits réservés.