Hutt City Council is continuing its programme of investment in natural-turf sportsgrounds to improve drainage performance, turf condition, resilience to wet weather and the number of playable hours available to the community. For the 2026/27 programme, HCC intends to undertake sportsground subsoil drainage and associated improvement works at HW Shortt Park and Memorial Park. The works include installation of lateral and collector subsoil drainage, drainage-disposal infrastructure, targeted grading, turf reinstatement and associated works. At HW Shortt Park, the works include on-site soakage infrastructure because conventional stormwater infrastructure is not available to receive the proposed subsoil drainage flows. The separately renewed cricket block will be completed before the drainage works commence, with this contract including the grading required to blend the surrounding field into the completed cricket-block levels. At Memorial Park, the majority of the proposed drainage system will discharge towards available stormwater infrastructure. A portion of the field cannot discharge by gravity and will require storage and pumped discharge to the stormwater system.
Publié
25.08.2026
Ouvert aux offres
25.08.2026
Date limite
23.09.2026
ROI - Daly Street Redevelopment
Ouvert aux offres·Oct 28
ROI - Future Waste Pathways
Ouvert aux offres·Oct 27
Advance Notice - Future Waste Pathways
Clôturé·Oct 22
Advance Notice - Daly Street Redevelopment
Clôturé·Oct 6
ROI - Residential Development – Lead Consultant Team
Clôturé·Sep 14
AN - Residential Development Lead Consultant Consortium
Clôturé·Sep 2
Wastewater Network Pipe Rehabilitation 2627
Ouvert aux offres·Oct 23
6 Paekākāriki Hill Road culvert renewal - construction
Ouvert aux offres·Oct 19
RFT - Paora Street Drainage Improvements
Ouvert aux offres·Oct 2
Contract 25/106 Woodend Water Renewals, Stormwater and Footpath Upgrade 2026/27
Clôturé·Sep 9
King Edward Street, Eltham Construction of Open Drain
Clôturé·Aug 10
#34 Paekakariki Hill Road Culverts Physical Works
Attribué·May 14
Nelson City Council - ROI - NTRLBU - Waste to Watts Project - 24 Nov 2026
Ouvert aux offres·Nov 2
Part A - Request for Comment (RFC) - Tauranga Urban, Tauranga School and Rotorua Urban Bus Services
Ouvert aux offres·Nov 2
14441 - Personalised Plates - ROI
Ouvert aux offres·Nov 2
Corporate Experience Programme
Ouvert aux offres·Nov 2
Registration of Interest (ROI) - Devonport Small Boats Facility
Ouvert aux offres·Nov 2
Te Kuiti Stormwater Rehabilitation - stormwater pipe lining
Ouvert aux offres·Nov 2
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.