Loading Otnox...
Otnox
NZNouvelle-Zélande·Acheteur: Department of Conservation

Rakiura Track upgrade & Chocolate Swamp Boardwalk Replacement

Ouvert aux offres·27 août 2026

The contract works are for the construction of timber boardwalk structures and track construction works on the Rakiura Track (Great Walk) and the Freshwater Landing-Mason Bay Hut Track (Chocolate Swamp Boardwalk), both of which are located within Rakiura National Park. Tenderers may submit for the entire package of works or the individual separable portions. Separable Portion 1: Rakiura Track (Stage 1) safety upgrade Separable Portion 2: Chocolate Swamp Boardwalk replacement

Publié

27.08.2026

Ouvert aux offres

27.08.2026

Date limite

04.10.2026