The Trust is undertaking the construction of a new Community Diagnostic Centre (CDC) Building, which requires an upgraded power supply to support its operations. The waiver was required because additional power can only be provided by UK Power Networks (UKPN), as they are the sole Distribution Network Operator (DNO) responsible for the electrical infrastructure in our geographical area. UKPN holds an exclusive statutory role in providing network upgrades, meaning no alternative suppliers can be considered.
Date limite
29.12.2025
Publié
24.01.2026
Awarded
24.01.2026
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Tous droits réservés.