The MRA are undertaking a comprehensive solar energy project across two sites, Lynemouth and Silverdale, which involves enabling works and pre-works surveys, detailed design updates, and the installation of Solar PV systems. The project includes site-specific tasks such as biodiversity management, grid connection infrastructure, and the provision of operational documentation and handover to maintenance teams. 1. Enabling works and pre-works surveys: Identifying, procuring (or utilising in-house capability) and undertaking any relevant enabling works surveys, such as trial pits. 2. Detailed design: Updating drawings and documentation in accordance with: • previously approved planning applications (approved 2020, extension submitted 2023) • G99 application • To include a biodiversity management plan and social value proposal. 3. Solar PV Installation: Procuring equipment, materials and labour associated with the approved design and operational use. Build to include: • infrastructure (where necessary for grid connection) • construction management oversight and documentation • handover to operations and maintenance teams • security of solar panels during build • implementation of biodiversity proposal on site (Lyne-mouth only) We have completed a compliant procurement by mini competition through the Crown Commercial Services Demand Management and Renewal Framework (RM6314). The Solar PV sites project demonstrates a strong commitment to ethical sourcing and supply chain integrity through the CCS Framework. This strategy ensures suppliers comply with modern slavery regulations, submit required documentation, and undergo rigorous evaluations. By engaging vetted suppliers dedicated to sustainability, the project promotes ethical practices and sustainability. Continuous monitoring through tools like the Modern Slavery Assessment Tool (MSAT) and the transparent contract structure ensure the project meets renewable energy goals while maintaining high standards of integrity throughout the supply chain. CCS DMR Ref: DMR-40954-2025
Date limite
03.10.2025
Publié
02.01.2026
Awarded
02.01.2026
VALE HOUSE SOLAR
Supply and/or Install of Rooftop Solar Photovoltaic Systems and Associated Equipment Y24013
Solar PV Panels for Various Sites - Installation
Selby - Solar Panel Installation to Appliance Bay Roof
Solar PV & Battery installation
Mayors Fund Solar PV Installations
CA18255 - RFQ2026/24 - NMANDD PEACEPLUS Thriving Together-Minority Community Support Programme: Sports for All for the Newry, Mourne and Down District Council area.
Creative Sector Services CIC (t/a Creative United) Take it away Scheme Credit Provider Contract
Childrens Playtower
2026-09-07 09:00 - QTN048 Exning to Stanton Community Primary School, Stanton - AWARD
Revenues and Benefits Printing and Mailing Service
ITT for project 10181682
© 2026 SIA «Vietne». Tous droits réservés.