The Ōhineangaanga Stream Erosion Protection Works project involves the construction of a range of river and stream management measures designed to stabilise stream banks, reduce erosion, protect surrounding infrastructure, and improve the long-term resilience and environmental health of the stream corridor. The works include the excavation and reshaping of sections of the stream channel and banks, installation of rock riprap erosion protection, construction of retaining structures including sheet pile walls and reinforced earth walls, and the implementation of grade control and flow management features to help manage water movement and reduce further erosion. The project also includes the creation of low-flow channel features and access benches to support both stream function and ongoing maintenance activities. Environmental management is a key component of the project. Works will be undertaken within and around the stream environment, requiring the management of stream flows, protection of aquatic habitats, and maintenance of fish passage during construction. Following construction, disturbed areas will be reinstated and riparian planting undertaken to enhance ecological values and support the long-term stability of the stream banks. Overall, the project is intended to provide a sustainable erosion protection solution that safeguards nearby assets, enhances the resilience of the stream system, and delivers environmental improvements within the Ōhineangaanga Stream catchment.
Publié
20.08.2026
Ouvert aux offres
20.08.2026
Date limite
18.09.2026
Part A - Request for Comment (RFC) - Tauranga Urban, Tauranga School and Rotorua Urban Bus Services
Ouvert aux offres·Nov 2
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Clôturé·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Clôturé·Oct 1
CON001926 - Whakatane Project Future Proof - Stage 4A
Clôturé·Aug 3
Whakatāne Project Future Proof – Stage 3B
Clôturé·Jul 1
CON002038 Geothermal Drilling M30
Attribué·May 28
746-27-261-PS - Kelston to New Lynn Cycling and Walking Connections
Clôturé·Oct 13
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Clôturé·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Clôturé·Oct 1
Huntly West Domain Courts Renewal
Clôturé·Sep 18
CON001926 - Whakatane Project Future Proof - Stage 4A
Clôturé·Aug 3
Contract 922 Reseal Professional Services
Clôturé·Jul 30
Seatoun Tunnel Repainting
Ouvert aux offres·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Ouvert aux offres·Nov 4
RFP Security Fencing OTRFP2026_649
Ouvert aux offres·Nov 3
ROI - Drainage Contractor for Kaipara College - Site: Drainage Remediation
Ouvert aux offres·Nov 3
Main Contractor for the Site: Carpark, Footpaths and Bus Shelter at Northcross Intermediate School
Ouvert aux offres·Nov 3
Main Contractor for the Blocks 2, 11: Re-aligning classroom walls, Removal of ACM cladding, and Classroom Refurbishment at Northcross Intermediate School
Ouvert aux offres·Nov 3
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.