As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) power cables and fibre optic cables. The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned. The landfall for the BEI project on the island of Bornholm is not included in the scope of this tender. Furthermore, the delivery and installation of the power cables are not part of this tender either. The landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure.
Publié
07.07.2026
Attribué
07.07.2026
Römische Bäder Fernmeldetechnik
S21, PA 1.7, OLA im Bestand inkl. S-Bahn-Neubau
SV-JWA-260811-003 - 110 kV Neubau Baufall 6050/25, Tief/Rohrbau mit Pressung für Stahlrohr
Planung und Bau einer Oberleitungsanlage - Im Rahmen der Neubaumaßnahme 20er-Gruppe in Speckenbüttel
Tief- und Rohrbauleistungen für den Bau der FGL096
Strassenbauarbeiten
Generalsanierung des Korridors Rechter Rhein - Bauleistungen
26FEI87699 - Externe Einlagerung von Fahrzeug-Ersatzteilen der SBH
Beschaffung von 5 Niederflur-Batterie-Solobussen
Bereitstellung eines Weitverkehrsnetzes (WAN)
Access - Trockenbau
Umrüstung Straßenleuchten auf LED
© 2026 SIA «Vietne». Tous droits réservés.