The University is delivering the Mary Seacole Building decarbonisation project using funding secured through the Public Sector Decarbonisation Scheme (PSDS). The scheme proposes to undertake a targeted decarbonisation programme and comprises: • Full design, supply and installation of a roof-mounted photovoltaic (PV) array, including associated electrical works, inverters, metering, modifications to existing electrical network and lightning protection adjustments. • Full design, supply and installation of building wide LED lighting replacement, covering approximately 2,200 internal luminaires and 48 external fittings, alongside upgrades to lighting controls, emergency lighting and associated making good of building fabric.
Date limite
23.04.2026
Publié
09.06.2026
Attribué
09.06.2026
ENHT - Theatre 5 and 6 Renovation Works
SUPPLY CHAIN NOTICE_WC1802680 & WC1582259 - (EP0035) Repair the flat roofs Waterproofing membranes at the north and south elevations & JRD Upgrades in line with the Defence Catering Strategy, Episkopi, Cyprus
ENHT - Theatre 7 and 8 Renovation Works
CBC-2083-Q-SM CBC industry Units refurbishments - AWARD
CA18051 - Tender 33/2026 - PEACEPLUS PP1012 - Greenhill YMCA Theme 1 - Internal Upgrade Works
PAHT - Kingsmoore Ward Refurbishment works
© 2026 SIA «Vietne». Tous droits réservés.