Kier Infrastructure are looking to engage experienced and qualified contractors for the Steelwork package for Roundthwaite Box solution in the Central Reservation works on the M6 Lune Gorge Scheme (Approx J38). Package is inclusive of but not limited to: Steel Fabrication Drawings, Steel fabrication, cutting or burning of piles. Interest can be flagged in accordance with other linked Roundthwaite Box advertisements. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Publié
25.06.2026
Ouvert aux offres
25.06.2026
Conditions mises à jour
25.06.2026
Date limite
30.06.2026
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
Ouvert aux offres·Oct 15
A66 Northern Trans Pennine Project(NTP) - Schemes 1, 2 Traffic Signals Package
Clôturé·Oct 5
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling
Clôturé·Sep 23
A66 Northern Trans-Pennine Project (NTP) - Scheme 1 & 2 Pavement Construction
Clôturé·Sep 15
M6 Lune Gorge - Steel road bridge plates - Fabrication and Installation
Clôturé·Sep 10
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Clôturé·Sep 9
Supply Chain Notice: WP039 Structural Steel / Metalwork
En cours de planification·Jun 4
Supply Chain Notice: WP039 Structural Steel / Metalwork
Clôturé·Jun 4
WP3040 - H7 Renewals Steelwork
Clôturé·Mar 24
WP3040 - H7 Renewals Steelwork
Clôturé·Mar 24
WP075.5_HRB Bearings
Clôturé·Nov 5
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.