The project comprises of the Survey, design and installation of Photovoltaic (PV) solar arrays on 21 school sites through the Sheffield area. The successful contractor will also be responsible for agreeing and maintaining individual Power Purchasing Agreements (PPA) with the various schools for the management and maintenance of the installed PV solar arrays.
Date limite
08.06.2026
Publié
13.08.2026
Attribué
13.08.2026
© 2026 SIA «Vietne». Tous droits réservés.