Publié
15.09.2026
Attribué
15.09.2026
Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS battery
Hydrologic Engineering Software Development for the Hydrologic Engineering Center (CEIWR-HEC), Davis, California, Multiple Award Task Order Contract (MATOC)
Calibration of Equipment for 249th EN BAT
Hydrologic Engineering Software Development for the Hydrologic Engineering Center (CEIWR-HEC), Davis, California, Multiple Award Task Order Contract (MATOC)
Calibration of Equipment for 249th EN BAT
Fire Alarm Upgrade
Exterior Decontamination Shelter - FARGO VA Medical Facility
JSF Flight Equipment Trailer
Guard Booth
USCG Academy Salt Shed
PANEL,BUILDING,PREFABR
SUPPLY: AZ-AZ FWCO-SHIPPING CONTAINER OFFICE
Heavy Equipment Brand Name Sole Source Justification
AMEND 0001: Requirement to start a 1GB commercial circuit Intra-Europe
HOSE ASSEMBLY,NONME
TRIP DEVICE,CIRCUIT
Courier Services at Brian D. Allgood Army Community Hospital for the Department of Pathology and Pharmacy
POWER UNIT,GAS TURB, IN REPAIR/MODIFICATION OF
© 2026 SIA «Vietne». Tous droits réservés.