We require an engineered solution for the Whareroa Wastewater Treatment Plant (WWTP) to replace an existing stainless steel multi-V-notch weir plate. The primary driver for this upgrade is the extreme seasonal flow variability at the plant, which the current device fails to measure accurately at the lower end of the spectrum. Documents are available at no charge via the GETS web site Tenders close within the GETS Tenderbox, at 2pm on Wednesday, 30 September 2026 Any enquiries please contact procurement@taupo.govt.nz The lowest price or any tender not necessarily accepted. Procurement Manager
Publié
04.09.2026
Ouvert aux offres
04.09.2026
Date limite
30.09.2026
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». Tous droits réservés.