Central Swindon North Parish Council invites tenders for a heat decarbonisation programme across four community centres: • Even Swindon Community Centre, SN2 2BG • Des Moffatt Western Community Centre, SN2 1NF • Gorse Hill Community Centre, SN2 8DA • John Moulton Hall Community Centre, SN2 5DU The works include design development from RIBA Stage 3 to Stage 4, decommissioning and removal of existing fossil fuel heating plant, installation of ASHP systems including associated pipework and emitters where required, electrical capacity checks and liaison with the DNO as required, installation/commissioning of BEMS, seasonal commissioning, training, and full handover documentation. This procurement is being conducted as an Open Procedure. Due to PSDS funding constraints the programme is time critical.
Publié
12.02.2026
Aktīvs
12.02.2026
Date limite
12.03.2026
Awarded
12.05.2026
Heat Decarbonisation Programme - Low Carbon Heating & BEMS Installation (4 Community Centres), Swindon
Attribué·Feb 12
CA17032 - Phase 4 Public Sector Decarbonisation Scheme
Clôturé·Jan 19
CA17032 - Phase 4 Public Sector Decarbonisation Scheme
Clôturé·Jan 19
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.