Fuel Cell Training Simulator A direct award justification applies due to the Urgency Clause Section 41 and Schedule 5. The equipment concerns a prototype / training bay for teaching. Urgent requirement to meet the Levelling Up Project funding claim deadline.
Date limite
02.02.2026
Publié
03.02.2026
Attribué
03.02.2026
Electrical Ecosystem & Heat Pump Training Bays - Levelling Up Project
Attribué·Feb 3
T/26/369/Group/Lvlup
Attribué·Feb 3
ECO House Trainer - Levelling Up Project
Attribué·Feb 3
Electrical Ecosystem & Heat Pump Training Bays - Levelling Up Project
Attribué·Feb 3
ECO House Trainer - Levelling Up Project
Attribué·Feb 3
ECO House Trainer - Levelling Up Project
Clôturé·Feb 3
Simulation Devices and Services
Attribué·Aug 6
Adopt South Virtual Reality Training
Attribué·Jun 19
Electrical Ecosystem & Heat Pump Training Bays - Levelling Up Project
Attribué·Feb 3
T/26/369/Group/Lvlup
Attribué·Feb 3
ECO House Trainer - Levelling Up Project
Attribué·Feb 3
Electrical Ecosystem & Heat Pump Training Bays - Levelling Up Project
Attribué·Feb 3
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.