The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed
Publié
23.02.2026
Attribué
23.02.2026
Tissue Organoid Research Infrastructure (TORI)
Høring vedr. udbud om Netværksudstyr
Kontrakt om anskaffelse af elektriske anlæg til udskiftning af Banedanmarks omformerstationer (Pakke 1)
Udbud af Interiør og Isoleringsarbejder på Søværnets Skibe
Procurement of monoflange valves for Køge, Herning and Frøslev - 26/12038
SonarQube Enterprise Edition licens
© 2026 SIA «Vietne». Tous droits réservés.