Palladium as the delivery partner for the Foreign, Commonwealth and Development Office (FCDO) funded UK Partnering for Accelerate Climate Transitions (UK PACT) programme invites you to submit a quotation for the services detailed in this RFQ. The Philippines is scaling up offshore wind to meet ambitious renewable energy targets, with upcoming auction rounds expected to unlock significant capacity. As the sector advances, attention is shifting toward enabling infrastructure particularly ports, which are critical for construction, staging, installation, and long-term operations. While initial assessments by partners such as ADB and GWEC have focused on public ports, the scale of planned deployment requires expanded port capacity and stronger private sector participation. However, there remains limited clarity on how to structure offshore wind port development to attract investment that is technically viable, commercially sound, and aligned with Department of Energy (DOE) deployment timelines. UK PACT, working with DOE and other agencies, seeks to address this gap by supporting privately led port development and strengthening decision-making, investment readiness, and early market engagement. This intervention will be delivered in two phases. Phase 1 will establish the foundations for private sector participation by drawing on UK experience, developing a Private Offshore Wind Port Development Framework, and identifying and prioritizing suitable port locations particularly in areas such as South Mindoro and Negros Occidental based on technical suitability and readiness. Phase 2 will undertake detailed technical and commercial feasibility assessments of three shortlisted sites, including infrastructure requirements, cost and financial analysis, environmental and regulatory considerations, and market validation Interested suppliers/consortia are encouraged to review the RfQ documentation and submit your proposal in accordance with the instructions above by the Close Date and Time. This RFQ includes the following materials: Schedule 1 - Terms of Reference Schedule 2 - Instructions for submission Schedule 3 - Terms and Conditions Annex I - RFQ Response Form Annex II - Budget and workplan template
Publié
10.06.2026
Ouvert aux offres
10.06.2026
Conditions mises à jour
10.06.2026
Conditions mises à jour
18.06.2026
Conditions mises à jour
24.06.2026
Date limite
13.07.2026
Renewable Energy Certification Integration in ASEAN
Clôturé·Sep 22
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
Clôturé·Sep 17
Bangladesh Carbon Market Governance & Readiness Sprint
Clôturé·Sep 11
Strengthening Carbon Market Readiness and Article 6 Operationalisation in Cameroon
Clôturé·Aug 27
Technical Assistance to Embed Renewable Integration in Madagascar Mining Permits
Clôturé·Aug 26
Unlocking Commercial and Industrial Captive Renewable Energy in Uganda: Market Sizing and Regulatory Reform
Clôturé·Aug 24
Portable Appliance Testing
Attribué·Aug 19
Electrical Infrastructure Upgrades and Other Works - Grays Police Station
Attribué·Aug 18
Festive Lights Installation and Maintenance
Clôturé·Aug 14
BMS Upgrade
Attribué·Aug 10
Institutional Capacity Enhancement for International Sustainability Standards Board (ISSB) Adoption in Thailand.
Clôturé·Jun 29
ASEAN Low-Carbon Urban Transport Action Plan Phase I
Attribué·Jun 1
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.