NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following highway works within the NC2A section: A41 Bicester Road East: tie-in and demolition of temporary works Waddesdon and Quainton: Highways and drainage works Putlowes Farm: Highways, including the Putlowes watercourse diversion Please express your interest within this package.
Publié
28.04.2026
Aktīvs
28.04.2026
Date limite
05.05.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Clôturé·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Clôturé·Sep 15
EKFB JV - As - Built Surveys
Clôturé·Aug 27
EKFB JV - Waste Management Services
Clôturé·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Clôturé·Jul 31
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Clôturé·Jun 23
Reconstruction of Smorthwaite Retaining Wall
Attribué·Sep 16
A639 Thwaites Gate to M1 Junct 44
Attribué·Aug 20
A61 Jumbles Lane - Carlton Lane
Attribué·Jul 24
EKFB JV - Highways Works NC2A
Clôturé·May 29
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Clôturé·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
Clôturé·May 12
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.