The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.
Publié
14.11.2024
Ouvert aux offres
14.11.2024
Date limite
16.12.2024
Talent Acquisition Recruitment Services
Front Line Support Services
SS/CON6484 - Master Data Management Software Implementation and Support
GWM14888 Moneypoint Turbine Overhauls 2024 - 2025
TR1816 ESB Furniture Nationwide Furniture Supply
TR2076 - Mechanical and Electrical Engineering Professional Services for ESB Network Headquarters Building
Provision of a Senior Integration Development Resource for the Student Information System Project
FCL033F Single Supplier Framework Agreement for the supply of Cleaning, Paper, Personal Hygiene and Period Equality Products
Consultancy Services (Integrated Design Team) Enabling the Potential of Ballaghaderreen Plots
CFT 4006 - Digital Collections System for SDCC Libraries
THE EXECUTION OF A PROGRAMME OF REPAIRS TO EXISTING FIRE DOORS AND THE CARRYING OUT OF ANNUAL INSPECTION / MAINTENANCE VISITS
Single-Party Framework Agreement for The Supply of Promotional Branded Merchandise for Beaumont Hospital
© 2026 SIA «Vietne». Tous droits réservés.