In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.
Date limite
01.06.2026
Publié
14.10.2026
Attribué
14.10.2026
D-TRO Project 2026 Support Services
Attribué·Oct 28
CareCubed Social Care Costing Software
Attribué·Oct 27
Heron Hill - Window & Door Replacement
Attribué·Oct 20
Legal Services Contract for the Heart of Barrow
Attribué·Oct 20
CWF Lot 2A - Moss Side Cattle Grid Replacement
Attribué·Oct 9
CWF Lot 2A - Town End (Orton) Bridge
Attribué·Oct 6
Nether Bridge Parapet Repairs
Attribué·Oct 6
Keswick to Threlkeld Bridge Deck Replacement Design and Installation
Attribué·Aug 3
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.