This D&B, 2-Stage Contract, is to reconstruct the bridge, including further actions (and not limited to) liaising with Network Rail (BAPA required for the works), ground investigation, scour assessment, obtaining approvals (i.e. LLFA), collaborative working with WAF Legal Team and Landowners, removal of the rock rolls, training walls repairs and construction, culvert repairs and reinstatement of the highway approach. Construction is to take place during the 2027 'in-river working window', or sooner.
Date limite
21.01.2026
Publié
07.07.2026
Attribué
07.07.2026
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Barrow Multi-Modal Transport Study
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Lot 2A- The Undertaking of Road Safety Studies 2026-2027
Lot 1b - Up to 8 Passenger Seats for Out of County area closing 2 February 2026 (F40)
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
Passenger & Goods Lift RTQ 2027 - AWARD
CWF Lot 1B - Heart of Kendal - Indoor Market Detailed Design and Construction
ASDA Roundabout Improvements
CPU 8626 Nuthall Rd - Llanberis to Cinder Hill Carriageway Resurfacing
CPU 8629 Footway - City Centre Streetscape Resource re Masonry Works
Workplace Services - Security Guarding
DPS1 1386 - Housing Tree Work
DPS1 1375 - Housing Tree Work
Future Employment Support - EOI
Vehicle Purchase
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
© 2026 SIA «Vietne». Tous droits réservés.