The Central Otago District Council is inviting proposals from experienced and qualified contractors for desludging two oxidation ponds at the Cromwell Wastewater Treatment Plant (WWTP). The scope of work covers: • Removal of the existing sludge stored in Geotextile bags (Optional Separable Portion) • Design of a sludge removal methodology, dewatering basin and monitoring programme • Desludging of the two oxidation ponds • Dewatering of the dredged sludge using suitable technology This procurement specifically covers the desludging and dewatering components. Disposal of the dewatered sludge and the new geotextile bag are excluded from the contract works. Desludging is a routine but infrequent maintenance activity essential for maintaining the treatment. The Cromwell ponds have been desludged previously in 2017. Further sludge surveys were conducted in 2026 and confirmed the need for intervention. For more info, see RFP document
Publié
31.08.2026
Ouvert aux offres
31.08.2026
Date limite
23.09.2026
ROI - Otara Wastewater Network Upgrade Design Services
RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build
2813 - Stafford Street and Barnard Street Water Services Renewal
Union Street Foxton - Wastewater and Watermain Renewals 2026-27
Greater Greymouth WTP Pre-treatment Upgrade
Katikati Wastewater Outfall Harbour Section Replacement – Early Contractor Involvement
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». Tous droits réservés.