Site investigation works at Colliery Rail bridge to facilitate detailed design of infilling works. To facilitate the detailed design, a number of site investigations are required, including boreholes, trial holes, and CCTV surveys. Direct award via the Rochdale Highway Related Services Framework.
Date limite
11.11.2025
Publié
14.04.2026
Awarded
14.04.2026
Play Area Replacement at St Johns Open Space, Newton-le-Willows
Attribué·Oct 28
Construction of Foundations - Hardshaw Brook Depot
Attribué·Jul 17
x1 - 18t Gritter
Attribué·Jul 16
Windle Hall Bridge Concrete Repair Works
Attribué·Jul 15
Rochdale Highways Related Services Framework Contract LOT 1 - Civils Works
Attribué·Apr 24
Rochdale Highways Related Services Framework Contract LOT 1 - Civils Works
Attribué·Apr 24
DNWP0037/LOT1B/ END STATES In Ground Mitigation / Tranche 4b remaining works
Attribué·Oct 15
Mids - CDF Lot 2 - River Slea Ground Investigations and ESE (OBC-FBC)
Attribué·Oct 9
Winfrith Pit 3 APC Soil Remediation Project
Attribué·Oct 8
M18 Greenland Lane Deck Structure Replacement - Ground Investigation
Attribué·Sep 29
GB-Sheffield: 5173.EFM.SW Runway Park Ground Investigations
Clôturé·Sep 10
M62 Heathfield Landslip - Ground Investigation
Attribué·Sep 9
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.