Currently there are two chillers at the Oncology building. The old R22 refrigerant chiller 2 needs to be replaced with a heat exchanger and pipes to the new chilled water system in the adjacent Parkside building ETP003. The works include construction of a new chilled water system from oncology to Parkside building. Associated works i.e. seismic engineering (NZS 4219), scaffolding, penetrations, lifting out the old R22 chiller through the roof.
Publié
15.09.2026
Ouvert aux offres
15.09.2026
Date limite
16.10.2026
Community Based Maternal Mental Health, Peer-led Support for Substance Related Harms
RFP for the Appointment of Suppliers to the Panel for the Supply of Molecular Diagnostics and Testing Technologies, Consumables and Associated Services
Request For Proposal of Supplier Capability Panel for high-throughput Laboratory Biochemistry Testing (HbA1c) Analysers, Consumables and Maintenance Services
After Hours and Urgent Care Services for Timaru
Improving Mental Health Inpatient Unit Environments Tranche 2 - Market Engagement
Kaiawhina Workforce RFP
ROI - Otara Wastewater Network Upgrade Design Services
Suppliers of Independent Asset Management Reviews
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
High Tech Imaging Services
Elective Surgery Services
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
© 2026 SIA «Vietne». Tous droits réservés.