Specialist engineering consultancy services for critical path tasks on the Bray to Greystones Cliff Walk,
Publié
30.10.2026
Attribué
30.10.2026
Provision of Painting for Office Reorganisation
Attribué·Oct 28
Upgrade Works to Wicklow Town Swimming Facility
Ouvert aux offres·Oct 28
PPM of BMS in County Building with Graphics and Software Support
Attribué·Oct 22
Single-Party Framework Agreement for Design and Build Refurbishment and Fit-Out Works at Blessington Library and Arts and Cultural Space
Ouvert aux offres·Oct 22
Provide E/R Consultancy Services for Hawkstown Phase 2
Attribué·Oct 21
Provide M/E Consultancy Services for Barndarrig Housing Development
Attribué·Oct 21
SCC2026-0182 Design Services at Lough Lumman, Co Sligo
Attribué·Oct 30
Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland
Attribué·Oct 29
NORA Additional Loading Rack and Dual Purpose Kerosene Storage Tank
Ouvert aux offres·Oct 22
N61 Tulsk to Clashaganny Road Project - Technical Consultancy Service
Attribué·Oct 22
SCC2026-0148 Design Services at Riverstown Co Sligo
Attribué·Oct 19
MiniComp for Civil Structural services Drawn from a Existing Zone B enabling Framework for Renovation/Refurbishment and fit-out of a light industrial unit for the decant of non-acute from UHG
Ouvert aux offres·Oct 16
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Ouvert aux offres·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Ouvert aux offres·Oct 30
Provision of Downhole Geophysical Logging Services
Ouvert aux offres·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Ouvert aux offres·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Ouvert aux offres·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Ouvert aux offres·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.