Deck realignment and jacking operation Tender There is a requirement to lower various bridge assets into please along the Curzon approach and a tender will be required to run for a short period to be able to meet the various key dates of the lowering of the bridge. While a scope of works is being put together the following are the basic requirements. o Provide a detailed temporary works Design for all equipment required to be used o Main scope: supply of the realignment and jacking system, and technical assistance for the operation on site with BBV self-delivering the works o As an option the supply of manpower and supervision to carry out the works in addition, including the bearing installation. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
Publié
24.03.2026
Ouvert aux offres
24.03.2026
Date limite
31.03.2026
BBV HS2 MWCC North - Pumped Drainage
Clôturé·Oct 21
BBV HS2 MWCC North - Precast Concrete Attenuation Tank - Design, Manufacture and Deliver
Clôturé·Sep 22
BBV HS2 MWCC North - Architectural Construction Works - Buildings
Clôturé·Jun 23
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
Clôturé·May 13
BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts
Clôturé·May 13
BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation
Clôturé·Mar 24
Balfour Beatty - Roads North of the Thames - LTC - FRC Structures Package
Clôturé·Sep 30
Liss Bridge Works
Attribué·Apr 23
Liss Bridge Works
Attribué·Apr 23
BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation
Clôturé·Mar 24
Moorside & Wardley Railway Bridge Refurbishment Scheme
Attribué·Mar 23
HNL - AOMR - Charville Lane access bridge replacement
Attribué·Mar 23
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Attribué·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.