Design, supply and installation of flooring and tiling systems including resin floors, ceramic tiling, screeds, paving, floor hatches, thresholds and associated finishes, incorporating all testing, certification, waterproofing interfaces and associated ancillary works across the MWCC North Portal Buildings.
Publié
09.10.2026
Ouvert aux offres
09.10.2026
Date limite
19.10.2026
BBV HS2 MWCC NORTH - Fire Engineer Services
Clôturé·Oct 8
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Clôturé·Mar 24
BBV HS2 MWCC NORTH - Soil Scientists Secondments
Clôturé·Mar 24
BBV HS2 MWC North Rayleigh Waves
Clôturé·Mar 13
BBV HS2 MWCC NORTH - Noise Barrier Consumables
Clôturé·Mar 13
BBV HS2 MWCC NORTH - Video conferencing Replacement plan
Clôturé·Mar 13
Specialist Works Framework - Windsor Road, Batley,
Attribué·Oct 13
Specialist Works Framework - Nether Hall Avenue Rawthorpe
Attribué·Oct 13
Specialist Works Framework - Waterloo Rise, Waterloo, HUDDERSFIELD
Attribué·Oct 7
PAHT-Lower Ground Floor Staff WC's. Additional/Extra Over Works.
Attribué·Sep 17
Specialist Works Framework - Farfield Road almondbury
Attribué·Sep 9
Specialist Works Framework - Leas Avenue, HOLMFIRTH,
Attribué·Sep 9
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Attribué·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.