To supply and install solar panels at 3 community centre's in Worcester Award via Fusion21 Framework (Lot 9 - Solar PV and Battery Storage) for Supply and Install solar panels at 3 Community Centre's
Date limite
01.01.2026
Publié
26.02.2026
Awarded
26.02.2026
Heating Metering, Billing Installation & Service
Accelerating high-voltage direct current (HVDC) development in Vietnam
Accelerating high-voltage direct current (HVDC) development in Vietnam
To supply, install, maintain and operate electric vehicle charge points
Electric heating
Provision of Air Source Heat Pump Systems and Solar Photovoltaic Arrays for Four Children and Family Hubs in Leicestershire
© 2026 SIA «Vietne». Tous droits réservés.