Otnox
UKRoyaume-Uni·Acheteur: National Highways Limited

Alloy Lighting Management System 26-28

Attribué·29 oct. 2026·GBP 503,894

Most street lighting on NH's Network is un-metered, which means that electricity supplier billing (approximately £40m per year) is based upon lighting inventory data. Estates & Facilities introduced Alloy in 2020 as a replacement to the legacy Street Lighting Database (SLD). This was to address resilience and functional concerns regarding the continued use of SLD. Alloy is used to manage and administrate changes to the company's lighting asset inventory data. For example, accurate reporting of LED lighting installation will result in lower carbon usage and reduced energy billing costs. It is also the initial data source for results from the national streetlighting survey currently ongoing, it is critical this service can continue

Date limite

20.09.2026

Publié

29.10.2026

Attribué

29.10.2026

Otnox

Trouvez les appels d’offres auxquels il vaut la peine de répondre.

Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.

  • Documents de l’appel d’offresConsultez les fichiers disponibles dans un seul espace de travail.
  • Exigences et risquesDemandez une analyse des documents avec des références aux sources.
  • Votre sélection d’appels d’offresPoursuivez avec les marchés et secteurs choisis.