This Scheme will cover Active Travel improvements on Gorse Street and Lower Audley Street, Blackburn And will encompass the installation of an uncontrolled pedestrian crossing with a kerbed centre island, roadmarking alterations, lighting column relocation, replacement lighting columns, associated electrical works, footway reconstruction, fencing and pedestrian controls, removal of trees, traffic signal civils works and carriageway patching.
Date limite
05.03.2026
Publié
10.06.2026
Attribué
10.06.2026
Conditions mises à jour
10.06.2026
Carriageway Surfacing 25/26 - Phase 4
Attribué·Sep 28
Carriageway Surfacing 25/26 (Phase 3)
Attribué·Sep 28
Carriageway Surfacing 26/27 - Phase One
Attribué·Sep 28
Active Travel Improvement Scheme (Phase 2)
Attribué·Jul 7
Tier 4 Detoxification: Lot 1 Inpatient Detoxification and Lot 2 Inpatient Residential Rehabilitation
Attribué·Dec 10
Repairs to a Retaining Wall on Blackburn Road, Egerton
Attribué·Oct 10
York Street-Wincolmlee Carriageway Maintenance
Attribué·Oct 27
BBV HS2 MWCC North - Pumped Drainage
Clôturé·Oct 21
Thrybergh War Memorial Civil Works
Attribué·Oct 7
Greasbrough War Memorial Civil Works
Attribué·Oct 7
Farrington Gurney Works NEC4 ECC Option A
Clôturé·Oct 5
Lot 5: Highways Civil Engineering works up to £499,999 (excluding VAT)
Attribué·Sep 11
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Attribué·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.