South Tees Development Corporation (STDC) ('the contracting authority') have awarded a contract to Esh Construction Limited for A66 Tees Dock Road Roundabout Improvements. The contract is Phase 1 with works including site clearance, ground investigations, drainage inspections, access modifications, temporary traffic management, and preparatory support for utility diversion works. This was procured under NEPO211 Lot 6. A further award notice will be published for the main works which were tendered as part of this package.
Date limite
20.08.2026
Publié
21.09.2026
Attribué
21.09.2026
TVCA-PROC-0932 - Legal Support for Spine Framework Creation
Attribué·Oct 30
TVCA-PROC-0901 - Legal Support
Attribué·Sep 1
Legal Support (WBD)
Attribué·Jul 6
Project Management Support
Attribué·Jul 3
STDC-PROC-0566 - Ground Remediation Consultancy Services (Site Wide and General) - STDC - (CCS RM6165 - Lot 1)
Attribué·Jun 29
Redcar Central Station Footbridge Business Case
Attribué·Jun 3
Lot 12 - Albert Street Play Area
Attribué·Sep 22
Willow House Enabling Works
Attribué·Aug 7
Oceansgate Phase 3.1 Enabling Works
Attribué·Jul 24
Storage Container for ASG Basement Access and CCTV Control
Attribué·Jul 17
Old Westgate Station Hotel Development, Wakefield
Attribué·Jul 1
M6 Lune Gorge - Roundthwaite Box - Civils Package
Clôturé·Jun 25
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Attribué·Oct 31
March 2027 Bus Contracts
Attribué·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Attribué·Oct 30
Provision of Pre-Paid Cards
Attribué·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Attribué·Oct 30
Business Travel Services
Attribué·Oct 30
Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.