Otnox
IEIrlande·Acheteur: Iarnród Eireann-Irish Rail

8562 Technical Support on MetroLink Interfaces

Attribué·9 oct. 2024·EUR 499,694

MetroLink is a transformative piece of new public transport infrastructure which will have 16 new stations running from Swords to Charlemont. The alignment will link Dublin Airport, Irish Rail, DART, Dublin Bus and Luas services and create a fully integrated public transport network for the Greater Dublin Area (GDA). The map below shows the extent of the route which is being developed by Transport Infrastructure Ireland (TII). MetroLink is currently at Railway Order stage, with a Railway Order having been submitted in mid 2022. Construction of MetroLink will impact the operation of Iarnród Éireann services on the Midland Great Western Railway (MGWR) and Great Southern and Western Railway (GSWR) railway lines at Glasnevin, which are themselves due to be upgraded as part of the DART+ West project. This DART+ West project is also currently at Railway Order stage, again submitted in 2022, and an Oral Hearing has been held in September and October 2023 on the scheme. Iarnród Éireann now propose to appoint an MDC to support Iarnród Éireann technically in understanding and agreeing the impacts of MetroLink on Iarnród Éireann heavy rail lines, in particular at Glasnevin and Tara Street Stations. The MDC will support technical issues across both design and proposed construction methods as both the DART+ and MetroLink projects progress.

Publié

09.10.2024

Attribué

09.10.2024

Otnox

Trouvez les appels d’offres auxquels il vaut la peine de répondre.

Créez un compte pour étudier cet appel d’offres et trouver des opportunités similaires.

  • Documents de l’appel d’offresConsultez les fichiers disponibles dans un seul espace de travail.
  • Exigences et risquesDemandez une analyse des documents avec des références aux sources.
  • Votre sélection d’appels d’offresPoursuivez avec les marchés et secteurs choisis.