Expression of Interest T5D MEP Subcontractor T5D Attenuator Overhaul (Survey / RIBA 4iii) Scope The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (level 7) via Airside. The objective is to replace the four attenuators in the T5D Shaft because they are at their end of life. The renewal of the T5D attenuators aims to reduce the risk of debris entering fans, tunnels and station, prevent the fans from failing in any fire scenario and provide ventilation and smoke clearance for the Heathrow Rail Tunnels. This improves safety conditions in Heathrow Rail Tunnels and improves resilience of systems. In addition, less maintenance and repair are required for the attenuator. Each attenuator is formed of four quadrants weighing around 1160 kg. Review MEP systems along the airflow and advise replacement/modification to bring them up to compliance. Surveys will be carried out by MEP Subcontractor under the direction of the Design Consultant (Employed by the Client). Item Question Q1 What capability do you have of understanding the requirements for replacing attenuators etc., considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the T5D Shaft during non-operational hours to provide all the information required to complete the RIBA 4ii design by the Design Consultant and the RIBA 4iii by the MEP Subcontractor? • M&E Services within the air path • Fan and Attenuator • Structure Note: - RIBA 5 onwards including construction is excluded.
Julkaistu
02.06.2026
Aktīvs
02.06.2026
Määräaika
09.06.2026
WP1140 - T5D Design Consultant
Suljettu·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Suljettu·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Suljettu·Jun 2
WP6235 -T5D MEP Subcontractor
Suljettu·Jun 2
WP1140 - T5D Design Consultant
Suljettu·Jun 2
WP2140 - TR19 MEP Surveys
Suljettu·May 7
Arts and Sports Bridge - Pre-Construction Professional Services
Myönnetty·Sep 23
HVAC design and Support services 2026
Myönnetty·Jul 31
Project Callisto
Suljettu·Jul 6
Members' Tea Room Refurbishment Project - MDS4001
Myönnetty·Jun 25
Cbip-Ws2-Risk Reduction-Mds-Riba2-Fwk1146-Mds4003
Myönnetty·Jun 25
Mds for Underground Car Park and Critical Services Works
Myönnetty·Jun 25
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.