The works are to include, strip the existing waterproofing system in all its parts, including insulation, back to the underlying Cross Laminated Timber deck. Inspect the existing deck for degradation and repair/ replace as necessary. Supply and install a new High-Performance Elastomeric TA-30 warm roof RBM system, incorporating a Parafoam Ultra Tapered Board Insulation scheme, achieving the maximum required U-value of 0.18 W/m²K. All works to include the temporary removal and reinstatement of all mechanical & electrical services.
Määräaika
12.02.2026
Julkaistu
04.08.2026
Myönnetty
04.08.2026
Greener Homes Initiative 26/27 - Phase 20
Myönnetty·Oct 23
Greener Homes Initiative 26/27 - Phase 19
Myönnetty·Oct 23
Provision of Hillingdon's Growth Plan and StrategicAsset Review
Myönnetty·Oct 16
LB Hillingdon - Hayes Public Realm Project
Myönnetty·Oct 16
Further Competition - Architecture + Urbanism Framework (GLA/ TFL reference: GLA81689) Hayes Town Centre Canalside Redevelopment Design Brief
Myönnetty·Oct 16
LBH21071 - Greener Homes Initiative 26/27 - Phase 13
Myönnetty·Oct 12
GB-Colchester: 0486-PA - Felt Flat Roof Replacement on Two Storey Blocks - (Contract J)
Myönnetty·Oct 9
Planned Roofing Works 27 West
Myönnetty·Sep 16
Provisions of External Decoration, Painting and Repair services
Myönnetty·Aug 6
GB-Colchester: 0481-PA - Small Flat Roofs (Flats & Maisonettes - Contract G) *Duplicated*
Myönnetty·Jul 28
GB-Colchester: Flat Roofing works (small roofs - Houses)
Myönnetty·Jul 28
CA17160 - Provision of Principal Contractor for Re-Roofing Companion Animal House (C.A.H.) Building 106
Myönnetty·Jun 30
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.