Old Oak Common Phase 2 The Subcontractor is required to design, install, monitor and coordinate all Traffic Management arrangements across Old Oak Common area. The Subcontractor provides TM drawings and schemes for each phase, delivers and installs all necessary equipment and produces bespoke signage as required. The Subcontractor facilitates access for utility companies, and provides road safety audit support. TM operatives are provided to manually control traffic signals, undertake maintenance and carry out required inspections, while emergency TM is provided upon request. The Subcontractor is required to coordinate with others to ensure Traffic Management schemes are adequate and timely to deploy a safe system of works and enable others works to occur undisturbed. The Subcontractor will also be required to coordinate with stakeholders to gather permits and all necessary approvals. The Subcontractor provides all materials, labour, management, plant, equipment, supervision and administrative support necessary to fulfil the works in accordance with HS2 health, safety, environmental and quality requirements. This includes providing named management personnel, maintaining office-based management at Old Oak Common, attending on site meetings, managing fatigue and resourcing, and installing temporary pedestrian routes if required.
Julkaistu
10.03.2026
Aktīvs
10.03.2026
Määräaika
20.03.2026
Fit Out -WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope - Old Oak Common (S4) Station
Myönnetty·Oct 8
Fit Out - WP12.7.1 - Painting and Sealants - Old Oak Common (S4) Station
Myönnetty·Sep 7
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4)
Suljettu·May 28
WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4)
Suljettu·May 28
Traffic Management - Old Oak Common (S4) Station
Suljettu·Mar 10
Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station
Suljettu·Oct 31
Housing & Property Management Level 4 apprenticeships
Myönnetty·Nov 3
Fire Remediation works - Baker House (D&B)
Myönnetty·Nov 3
Humber Economic Strategy Delivery Plan
Myönnetty·Nov 3
ENHT - Legal Support HCH PFI 2026
Myönnetty·Nov 3
Super Pumping Appliances
Myönnetty·Nov 3
APEX and PowerApp Support
Myönnetty·Nov 3
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.