Luas Finglas is a 4 km extension of the Luas Green Line, delivering a high-capacity light rail connection between Finglas and Dublin city centre to support sustainable transport and urban development. The scheme will serve communities including Charlestown, Finglas Village, Finglas West, St Helena’s, and the Tolka Valley, and will comprise four new stops at St Helena’s, Finglas Village, St Margaret’s Road, and Charlestown. It also includes a 350-space Park and Ride facility near St Margaret’s Road, as well as interchange opportunities with bus services and with mainline rail services at Broombridge. The Luas Finglas Main Infrastructure Design and Construction Works will be delivered under the NEC4 Engineering and Construction Contract (ECC) Option C (Target Cost with Activity Schedule). The scope of this Contract (TII-499) includes, but is not limited to, the design and construction of the following principal elements: 1. Site clearance and demolitions. 2. Track (trackbed and rails). 3. Luas Stops at St Helena’s, Finglas Village, St Margaret’s Road and Charlestown. 4. Broombridge stabling site works. 5. Park and Ride facilities at St Margaret's Road. 6. Royal canal and rail overbridge at Broombridge. 7. Tolka Valley Park Bridge. 8. Fencing, retaining walls, boundary treatments and accommodation work. 9. Utility services realignment, diversion, replacement, and protection. 10. Road realignments and junction modifications. 11. Pedestrian and cycling facilities including cycle storage structures. 12. Road traffic signalling. 13. Landscape and urban realm upgrades. 14. Overhead Catenary System (OCS). 15. Power and Systems infrastructure. 16. Signalling, controls and other rail systems. 17. Working in live traffic environment on the busiest radial corridors in the greater Dublin area including property and business frontage reconfiguration. 18. Heritage / archaeology mitigation works. 19. Installation of stop furniture. 20. Installation of Validators and Ticket Vending Machines. 21. Other Ancillary works. The successful Contractor will also be responsible for: • Overall systems integration. • Interfacing and co-ordinating with other works packages to facilitate completion of works. • Interfacing and co-ordinating with stakeholders. • Testing and commissioning.
Julkaistu
05.10.2026
Avoinna tarjouksille
05.10.2026
Määräaika
14.12.2026
MetroLink Programme Delivery Partner Support Services
Myönnetty·Oct 26
TII433 Amazon Web Services Cloud Consumption
Myönnetty·Oct 23
TII466_Tunnels Contract Administration and Technical Services
Myönnetty·Oct 22
TII323_16 M8 Dunkettle Interchange to Junction 17 Watergrasshill Phase 2 Pavement Renewal Scheme
Myönnetty·Oct 20
TII479
Myönnetty·Oct 14
M700.CN.1025 - Soft Facilities Management Services for MetroLink (TII)
Avoinna tarjouksille·Oct 5
TII424: OCS Works Framework Agreement
Myönnetty·Aug 26
TII424_001 Call Off 001 Red Cow section insulators replacement Contract
Myönnetty·Aug 24
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Avoinna tarjouksille·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Avoinna tarjouksille·Oct 30
Provision of Downhole Geophysical Logging Services
Avoinna tarjouksille·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Avoinna tarjouksille·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Avoinna tarjouksille·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Avoinna tarjouksille·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.