The Energy Efficient Design (EED) process is intended to ensure that the Contracting Authority’s capital projects are conducted in accordance with objective and methodical protocols and procedures. The overall EED process comprises organisational measures, processes, guiding principles and control mechanisms to be implemented during the design of projects, with the targets of (i) reducing the lifecycle energy consumption and GHG emissions of the building when in use and (ii) achieving a building that is Carbon Zero Ready (i.e., a building that will be carbon zero when the electrical grid decarbonises). In accordance with national and sectoral guidance, the EED process shall be applied to all projects with a value greater than €1,000,000. The purpose of this competition is to appoint a suitably-qualified and experienced EED Facilitator who will draft and submit key EED reports in accordance with this Specification of Requirements document. Such reports will serve to measure progress of the EED process as applied to each capital project and effectively communicate the results of the EED process to Contracting Authority project stakeholders.
Julkaistu
28.09.2026
Avoinna tarjouksille
28.09.2026
Määräaika
02.11.2026
Contract with Options for the Supply, Support and Maintenance of EMG/NCS Systems
Avoinna tarjouksille·Oct 19
The Provision of a Treatment Pathway for Low Complexity Spinal Patients
Avoinna tarjouksille·Oct 15
Multi-Party Framework Agreement for the Provision of a Non-Operative Treatment Pathway for Low Complexity Spinal Patients
Suljettu·Sep 28
The Provision of Fluid Warmers and All Related Consumables
Suljettu·Sep 21
Single-Party Framework Agreement for The Supply of Promotional Branded Merchandise for Beaumont Hospital
Suljettu·Sep 18
The Execution of a Programme of Repairs to Existing Fire Doors and the Carrying Out of Annual Inspection / Maintenance Visits
Suljettu·Sep 18
Voluntary Ex Ante Transparency Notice for direct award of contract for dewatering system operations at Kevin Street Lower Dublin 8.
Myönnetty·Oct 19
Multi Party Framework for Environmental Consultancy Services
Myönnetty·Aug 31
Multi-Disciplinary Consultancy Services for EPA Abstraction Licensing Support Services - Waterways Ireland
Suljettu·Aug 4
Donegal County Council -The Two Rivers - Catchment, Community and Climate Project, Carndonagh, Co. Donegal
Suljettu·Jul 24
Provision of Consultancy Services for a District Heating Feasibility Study for Carlow County Council
Suljettu·Jul 20
9916 Nationwide Biodiversity Map, Measure and Score Project
Suljettu·Jul 8
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Avoinna tarjouksille·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Avoinna tarjouksille·Oct 30
Provision of Downhole Geophysical Logging Services
Avoinna tarjouksille·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Avoinna tarjouksille·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Avoinna tarjouksille·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Avoinna tarjouksille·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.