This Registration of Interest (ROI) is for Ōtara Wastewater Network Upgrade Design Services. Scope is to deliver preliminary and detailed design through to a tender-ready package suitable for open-market procurement of physical works under NZS 3910. The designer will be responsible for end-to-end delivery of a complete design solution and associated deliverables, including: • Site investigations and verification activities • Preliminary design and detailed design across all engineering disciplines • Facilitation of technical workshops (HAZOP, SiD) • Resource consents and approvals • Preparation of tender document
Julkaistu
16.09.2026
Avoinna tarjouksille
16.09.2026
Määräaika
04.10.2026
ROI - CT8539 - Waikato District Reservoirs
Avoinna tarjouksille·Oct 23
RFP - South -Central Networks Maintenance 2026
Avoinna tarjouksille·Oct 4
RFP - New Connections 2026
Suljettu·Sep 10
RFP - Complex Asset Maintenance (CAM) Specialist Consultant
Suljettu·Sep 3
ROI - Registration of Interest - Waikato Water Supply Programme Alliance
Suljettu·Sep 1
RFP - Supply of Commercial Smart Meters
Suljettu·Aug 28
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Avoinna tarjouksille·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 25
Water and Wastewater Assets Valuation
Avoinna tarjouksille·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Avoinna tarjouksille·Oct 18
Water Mains Resilience Phase Three
Avoinna tarjouksille·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Avoinna tarjouksille·Oct 18
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.