TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too. Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new. Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline. We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.
Julkaistu
08.09.2026
Avoinna tarjouksille
08.09.2026
Määräaika
05.10.2026
RFP 2826 South Timaru Hydraulic Model Build and System Performance
Avoinna tarjouksille·Oct 15
RFP2828 - Timaru CBD Tile Replacement Programme Investment and Delivery Plan
Suljettu·Sep 22
2813 - Stafford Street and Barnard Street Water Services Renewal
Suljettu·Sep 6
RFT2797 - Kellands Hill/Rosewill Valley/Cartwrights Roads “SH1 Resilience Route” Project
Suljettu·Aug 19
RFT2647- Landsborough Road Bridge
Suljettu·Aug 14
RFP2702 - Talbot Street Sewer Main Upgrade
Suljettu·Jul 8
Ohourere Water Treatment Plant - Electrical and Process Upgrade
Avoinna tarjouksille·Oct 29
Lake Terrace Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 25
Water and Wastewater Assets Valuation
Avoinna tarjouksille·Oct 23
PNCC - 26_047 - Milson Line Water Reservoir Design and Build
Avoinna tarjouksille·Oct 18
Water Mains Resilience Phase Three
Avoinna tarjouksille·Oct 18
RIV_2600611 Rangitata/Rakitata River Flood Resilience – Groyne Rockwork Reinstatement
Avoinna tarjouksille·Oct 18
PNCC - Waste Water Treatment Plant Seismic Strengthening
Avoinna tarjouksille·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.