Julkaistu
02.09.2026
Avoinna tarjouksille
02.09.2026
Määräaika
25.09.2026
NESDIS Enterprise Mission Operations (NEMO)
Suljettu·Oct 16
NESDIS Enterprise Mission Operations (NEMO)
Suljettu·Oct 13
Notice of Intent to Sole Source: NOAA- Satellite Ocean Color System Vicarious Calibration – Marine Optical BuoY (MOBY) Operations and Maintenance
Suljettu·Oct 6
NESDIS Enterprise Mission Operations (NEMO)
Suljettu·Oct 1
Purchase the following equipment: Inflation Table (Kitted), PN: J407-43008-10
Suljettu·Sep 24
Water Mist Fire Suppression System
Suljettu·Sep 18
Ka-band High Throughput System (KaHTS) Ground Bounce
Myönnetty·Sep 15
Maintenance of Digital CATV System
Myönnetty·Sep 15
Project HALO: Hybrid All-domain LEO Operations
Suljettu·Sep 8
This effort encompasses all technical, logistical, software and hardware efforts required to produce CCS Meadowlands systems.
Suljettu·Sep 2
USNA Distributed Antenna System (DAS) Maintenance and Support
Suljettu·Aug 29
Cable Services
Suljettu·Aug 28
Bolt,Shear
Avoinna tarjouksille·Oct 30
Sources Sought Installation Services of a Cable Rail Fence System
Avoinna tarjouksille·Oct 30
Mirror Assembly,Rearvi
Avoinna tarjouksille·Oct 30
Removal, Repair, Reinstallation of Winco LP Standby Generator, Sixs Rivers NF
Avoinna tarjouksille·Oct 30
Slide,Drawer,Extension
Myönnetty·Oct 30
926CM3010 Cemetery Expansion and FCA Improvements Project Washington Crossing National Cemetery
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.