Quarry Road substation detailed design. The substation development will include a 33 kV switchboard, one 33/11 kV 5 MVA transformer and an 11 kV switchboard. The site will be designed to accommodate a second supply transformer. The design for this substation was substantially completed, and the project was put on hold. The bulk of the civil and structural design, as well as the primary design, is expected to be used as far as practicable. Tenderers should be aware that PowerNet’s secondary and protection design requirements have undergone significant changes since the previous design was completed. The substation design includes the following: • Bus the Halfway Bus-Palmerston 1 and 2 feeders at Quarry Road • One 33 kV/11 kV, 3.5/5 MVA ONAN/ONAF, OLTC transformer • Relocation of the ripple control from TPT Palmerston 110/33 • 33 kV and 11 kV points of connection for the mobile substation • Substation civil works, including site grading, fencing and earth grid • Communications mast • New switch room • New 11 kV Feeder cabling • Protection System • Scada System • Safety in Design Reviews • Procurement Assistance • Construction Package
Määräaika
28.10.2025
Julkaistu
12.11.2025
Myönnetty
12.11.2025
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Suljettu·Aug 4
RFT - 220kV EDN GXP and 100kV Line Build Project | CIVILS
Myönnetty·May 29
Construction and Installation Services for Kelso and Waikaka Transformer Replacements.
Myönnetty·Dec 8
Main Contractor for the new PowerNet Frankton Depot
Myönnetty·Dec 3
Advance Notice - RFT SPF Package 10A - Electrical Integration Contractor
Avoinna tarjouksille·Sep 29
Registration of Interest (ROI) - PowerNet Distribution Network Services - Lakeland Network
Suljettu·Aug 4
RFP - Watercare Electricity Supply
Suljettu·Jul 20
P2026-777 2026 Street Light and Traffic Signal Management Contract
Myönnetty·May 6
Request for Proposal (RFP) Electricity Supply
Myönnetty·Apr 20
Health NZ Te Toka Tumai Auckland - Greenlane Clinical Centre Electrical HV Works - 2 x Prefabricated Substation Switchrooms
Myönnetty·Oct 5
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Avoinna tarjouksille·Oct 29
Herschell Street Carpark Redevelopment
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Avoinna tarjouksille·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Avoinna tarjouksille·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Avoinna tarjouksille·Oct 29
Bayswater School - Main Contractor for 1, 2, 3, 5, 100636, site: Full Roof Replacements, fixings, and Clearlite roofing.
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.