The works are required to ensure a safe fire escape route for staff and the public and involve the installation of a protective ceiling system beneath an existing suspended ceiling. The solution includes the installation of a structural timber framework and plywood barrier designed to contain falling debris and maintain safe access and headroom. All works will be carried out in accordance with the Control of Asbestos Regulations 2012 and relevant health and safety legislation. The works include site preparation, installation, sealing to prevent dust migration, and full clean-up. This requirement has been identified as urgent due to health and safety risks associated with the existing conditions, and immediate action is required to ensure compliance and safe operation of the facility.
Määräaika
14.08.2026
Julkaistu
02.09.2026
Myönnetty
02.09.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Myönnetty·Oct 12
Dirty Utility Works GRH Tower Block
Myönnetty·Sep 8
King Builders Various Minor Works Projects
Myönnetty·Aug 19
Women's Centre Fire Door Mag Lock Works
Myönnetty·Aug 18
Project Management Support _ Provelio
Myönnetty·Aug 17
CGH BMS Upgrade Project 2026/2027
Myönnetty·Aug 6
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Myönnetty·Oct 31
March 2027 Bus Contracts
Myönnetty·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Myönnetty·Oct 30
Provision of Pre-Paid Cards
Myönnetty·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Myönnetty·Oct 30
Business Travel Services
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.