DPC proposes to engage in a competitive process for the establishment of a Multi-Party Framework Agreement for the provision of Civil Engineering Works at Dublin Port and other lands under DPC’s control. The Framework will be concluded under the EU Utilities Directive 2014/25/EU and the associated Irish Statutory Instrument, S.I. No. 286 of 2016, implementing that Directive with binding force, specificity, precision and clarity, under Ireland’s obligations under the EU Treaty. It is acknowledged that the full scope of services cannot be defined, as it will be influenced by the conditions of regulatory consents/licences yet to be issued. As and when required, DPC will procure these works under the Framework. The successful Framework Members will be required to carry out civil engineering works in connection with DPC’s Masterplan projects and associated capital works projects at Dublin Port. The works listed below, although non-exhaustive, may be required under the Framework and delivered to the satisfaction of DPC, as included in the Masterplan Projects, including Alexandra Basin Redevelopment / MP2 / 3FM, which include the following: • Dismantling of infrastructure and removal of infill material • Quay wall refurbishment/construction (designed to accommodate future dredging to a level of -15.0m CD) • Installation of Ro-Ro ramps. • Ro-Ro jetty works. • Dredging of basin and berths. • Treatment of contaminated dredged material and re-use as infill on site. • Development of cultural heritage interpretative space. • Infilling of existing Berths (including where appropriate with treated dredged material). • Raising of existing surface levels. • Mooring jetty construction. • Construction of surge protection/retaining wall. • Surfacing of areas behind key walls using a combination of concrete slabs and bituminous surfacing or block paving for terminal yards/roads. • Wall Protection Works, including concrete Mattresses being lifted into position. • Port equipment, including relocation and refurbishment of existing ramps. • The relocation of loading operations to a new quay across the Port. • Internal road and bridge construction works throughout the Port. • Port-related buildings. • Specialist equipment supply (e.g. Loading Arms, Conveyor Systems, Fixed/Mobile Cranes, STS, specialist pipeline (e.g. Oil, Gas and the like). • Port Electrification upgrade infrastructure works. • Core civil engineering works including roads, pavements and hardstanding; drainage and utilities infrastructure; earthworks and ground remediation; civil structures (retaining walls, culverts, bridges); marine and quay-adjacent civil works; • DPC reserves the right to include additional ancillary works or enabling works as required to deliver the masterplan projects, including but not limited to, Additional/related services: site enabling works, temporary works design, traffic management during construction to facilitate the civil engineering works. DPC is seeking only candidates capable of delivering the full range of works listed above, whether in-house or as a grouping/consortium. Applications relating to only one or several of these disciplines will be rejected.
Julkaistu
16.10.2026
Avoinna tarjouksille
16.10.2026
Ehdot päivitetty
16.10.2026
Määräaika
16.11.2026
Multi-Party Framework for Port Hydrographic Survey Works
Suljettu·Sep 18
Multi Party Framework for Project Supervisor for the Design Process PSDP Services
Suljettu·Aug 11
Provision of DC Pension Master Trust Services
Suljettu·Jun 22
Quantity Surveying and Commercial Management Framework.
Suljettu·May 21
Multi-Party Framework for Electrical Consultancy Services (with Mechanical Specialist)
Suljettu·Mar 26
Insurance Brokerage Services
Myönnetty·Dec 9
Upgrade of Ablutions to Accommodation Blocks 12 and 13, Collins Barracks, Co Cork
Myönnetty·Oct 29
WCCC26 382 Dunhill Eco Park Refurbishment Works
Myönnetty·Oct 29
Cherry Orchard Hospital - Blackthorn unit, Community Day Care Refurbishment
Avoinna tarjouksille·Oct 27
Nenagh Court House - External Dampness Remediation Works
Myönnetty·Oct 27
Alterations and refurbishment of the Gallowglass Community Centre, Milford, Co. Donegal
Avoinna tarjouksille·Oct 27
The replacement of Fire Doors in Connolly Hospital
Avoinna tarjouksille·Oct 24
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Avoinna tarjouksille·Oct 30
Call for Tender for the provision of Hot School Meals under the School Meals Scheme to Churchtown NS 07790U
Avoinna tarjouksille·Oct 29
Tourism Representation Services in the Gulf Cooperation Council (Gcc)
Avoinna tarjouksille·Oct 29
2026PR082 Request for Tenders (RFT) for the provision of Netwrix Auditor Support and Maintenance services to the NTMA.
Avoinna tarjouksille·Oct 29
Provision of Auditing Services for the Timber Sales Auction System
Avoinna tarjouksille·Oct 29
Monasterevin Market Square Regeneration
Avoinna tarjouksille·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.