Port of Waterford are inviting tenders for a term-measured maintenance dredging contract at the Port in Southeast Ireland to maintain depth in the Ports navigational channel, turning circle and berths. The work is to be executed by a modern Trailing Suction Hopper Dredger with at least two campaigns annually. All information is contained in the Tender Documents
Julkaistu
23.10.2026
Avoinna tarjouksille
23.10.2026
Ehdot päivitetty
23.10.2026
Määräaika
23.11.2026
Design, Construction, Commissioning and Delivery of Purpose Built Pilot Boat
Avoinna tarjouksille·Oct 26
Design, Construction, Commissioning and Delivery of Purpose Built Pilot Boat
Suljettu·Sep 14
Supply of renewable electricity
Suljettu·Sep 4
Small Works Framework for Civil Engineering Works for the Port of Waterford
Suljettu·Jun 22
Engineering Consultancy Services to establish the structural integrity of the existing quay structure for the Port of Waterford
Suljettu·Jun 12
Supply, delivery and commissioning of new multi-purpose port container reach stacker
Suljettu·May 13
New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village
Avoinna tarjouksille·Oct 30
2026/026 Establishment of a Single-Party Framework Agreement for the provision of the Design and Delivery of the “GROW360 PROGRAMME”
Avoinna tarjouksille·Oct 30
Provision of Downhole Geophysical Logging Services
Avoinna tarjouksille·Oct 30
OPW Tender for Cash Collection, Cash Processing and Cash in Transit Services
Avoinna tarjouksille·Oct 30
Call for Tender for the Supply, Delivery and Commissioning Of VR Welding Simulators and Compatible VR Headsets for Donegal ETB
Avoinna tarjouksille·Oct 30
Design and build Dublin Air Traffic Control Centre (ATCC) contingency room
Avoinna tarjouksille·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.