The M6 Lune Gorge Structures Scheme requires Structural Monitoring across 6nr bridges, as well as CR monitoring to temporary piling on the scheme. The package will be split into 3 parts; Monitoring of the existing bridge substructures during demolition and replacement deck installation, monitoring of new construction considering settlement / tilt and vibration monitoring through construction and into post construction, and central reserve temporary embedded retaining walls works associated with piling / retaining wall construction. Tenderers will be required to propose an efficient manual / automated monitoring methodology meeting the stated frequencies, data capture, and reporting aligned with trigger and mitigation actions. Considerations around access and sequencing will be discussed. The package includes, but is not limited to: control points, baselining, routine monitoring (Ranging from daily to weekly), and maintenance.
Julkaistu
21.04.2026
Aktīvs
21.04.2026
Määräaika
04.05.2026
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
Avoinna tarjouksille·Oct 15
A66 Northern Trans Pennine Project(NTP) - Schemes 1, 2 Traffic Signals Package
Suljettu·Oct 5
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling
Suljettu·Sep 23
A66 Northern Trans-Pennine Project (NTP) - Scheme 1 & 2 Pavement Construction
Suljettu·Sep 15
M6 Lune Gorge - Steel road bridge plates - Fabrication and Installation
Suljettu·Sep 10
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Suljettu·Sep 9
CWF Lot 2A - Town End (Orton) Bridge
Myönnetty·Oct 6
M6 Lune Gorge Structures - Monitoring Services
Suljettu·Apr 21
Debtor Tracing Services
Myönnetty·Oct 28
QOC971 2026-10-28 (0900) Lowestoft - Bure Park Specialist Academy, Great Yarmouth (4 seats, Individual Transport) - AWARD
Myönnetty·Oct 28
ASB505 0900 2026-10-28 Bury St Edmunds-The Junction, Stowmarket (4-seater vehicle) required. - AWARD
Myönnetty·Oct 28
CSP26893 - Administrator
Myönnetty·Oct 28
Portering Task Management System
Myönnetty·Oct 28
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Myönnetty·Oct 28
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.