Greater Wellington Regional Council (GWRC) is seeking proposals for the design, supply, installation, and commissioning of a Depot Protection System (DPS) for a new rail maintenance depot in Masterton. We are looking for suppliers with proven experience delivering similar systems in Australasia. This is a unique opportunity to contribute to a high-profile, multi-year regional rail programme, the Lower North Island Rail Integrated Mobility (LNIRIM) initiative, which will transform inter-regional passenger transport across the Wellington and Horizons regions. The DPS will support the safe operation of a new fleet of independently powered electric multiple units (IPEMUs), which will service the Wairarapa and Manawatu lines from 2028. The selected DPS Contractor will be a Nominated Subcontractor under the IPEMU Depot Contract and engaged by the IPEMU Depot Builder to deliver the DPS works. The DPS must be ready for commissioning by mid-2028. This RFP is being released in parallel with the IPEMU Depot procurement to ensure early integration and cost certainty. Key dates: - RFP release: Mon 15 Sept 2025 - Questions close: 5:00pm Fri 10 Oct 2025 - Proposals due: 11:30am Fri 17 Oct 2025 All communications must be submitted via GETS. For full details, refer to the RFP documents.
Määräaika
24.10.2025
Julkaistu
20.04.2026
Myönnetty
20.04.2026
GW Environmental Restoration (ER) Services
Avoinna tarjouksille·Oct 9
Advance Notice: GW Environmental Restoration (ER) Services
Suljettu·Oct 5
Real-Time Passenger Information System
Avoinna tarjouksille·Oct 2
Journey Planner Engine
Suljettu·Aug 25
Greater Wellington Future Bus Services - Tranche One
Suljettu·Apr 30
Lower North Island Rail Integrated Mobility - RFP for Design and Build Construction Services for Masterton Maintenance Depot
Myönnetty·Apr 20
Long Range One Way Effector
Avoinna tarjouksille·Nov 5
Craig Road Slip Repair (Whangarei Heads Road RP17940)
Avoinna tarjouksille·Nov 5
Seatoun Tunnel Repainting
Avoinna tarjouksille·Nov 4
130-140 Grafton Rd Retaining Wall Construction
Avoinna tarjouksille·Nov 4
Main Contractor for the Blocks 2, 3, 4, 8: Replace Failed Door Ranch Sliders and Window Winders at Oteha Valley School
Avoinna tarjouksille·Nov 4
Main Contractor for the Blocks 1, 4, 5, 6, 8: Roofing and Ceiling Tile Works at Oteha Valley School
Avoinna tarjouksille·Nov 4
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.