Upgrade of lighting columns To provide professional advice and guidance on the most appropriate design and LED lighting system for Broseley, the design must meet the equivalent design to current lighting. Lighting must meet the following regulations BS5489 and BSEN 13201-3:2015 To provide costs for: 17 Sodium street lights on concrete columns to LED with new steel or aluminium columns 3 LED street lights on concrete columns to new steel or aluminium columns.Disconnection costs of old columns to be included. To provide a full specification for the proposed column and lantern including column material and lantern colour temperature. To include safe disposal of existing Sodium lamps and concrete columns. To provide details of the type of LED you propose to use, including the reason and benefits. To provide systems of traffic management in accordance with chapter 8 and contractors procedures within CDM documentation. To provide details of typical energy savings, and maintenance features plus any additional ad hoc installation costs. The light specified in your quote should also be able to be adjusted onsite and offsite after installation if necessary. To cost for columns to be constructed of steel and aluminium, and hinged to assist with on-site maintenance. Costs within the quotation to include any necessary grass reinstatement works that may be required following completion of works, including top dressing and seed. Any areas requiring hard digging will be refinished to the match the existing surface. Any hard excavations to replace with suitable matching surface. To cost all items individually.
Määräaika
04.11.2025
Julkaistu
16.12.2025
Myönnetty
16.12.2025
Allotments Groundworks and Water Infrastructure Installation
Suljettu·Jun 4
Allotments Groundworks and Water Infrastructure Installation
Suljettu·Jun 4
Broseley Town Council's Christmas Lights Installation 2026
Suljettu·Apr 20
Broseley Town Council's Christmas Lights Installation 2026
Suljettu·Apr 20
Conversion of Existing Storage Unit to Public Toilet Facility
Suljettu·Feb 23
Conversion of Existing Storage Unit to Public Toilet Facility
Suljettu·Feb 23
Structural Testing of Street light Columns
Myönnetty·Mar 27
Structural Testing of Street light Columns
Myönnetty·Mar 27
Accountancy Apprenticeships
Myönnetty·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Myönnetty·Oct 29
Transition and Exit Technical Support Service
Myönnetty·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Myönnetty·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Avoinna tarjouksille·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Myönnetty·Oct 29
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.